Developing a train timetable according to track maintenance plans: A stochastic optimization of Buffer time schedules
M. Bababeik,
S. Zerguini,
M. Farjad-Amin,
N. Khademi and
M. Bagheri
Additional contact information
S. Zerguini: GREThA - Groupe de Recherche en Economie Théorique et Appliquée - UB - Université de Bordeaux - CNRS - Centre National de la Recherche Scientifique
Post-Print from HAL
Abstract:
The scheduling of maintenance operations in railway is a major concern for both maintenance planners and train dispatchers since it requires the track to be blocked and the rail traffic to be disrupted. This paper provides a mathematical programming model aimed at adjusting the timetable of trains in a single track according to maintenance operations. The uncertainty of the maintenance activities might cause delays in the initial maintenance plan which is further overlapped with pre-determined train scheduling. This study addresses the uncertainty in maintenance activities through including buffer time to the modified scheduling. We also addressed the operational constraints such as speed limit due to maintenance operations in the adjusted scheduling. The result of the model provides railway planners with a modified timetable which includes both maintenance plan and train operations schedules
Date: 2019
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Published in Transportation Research Procedia, 2019, 37, pp.27-34. ⟨10.1016/j.trpro.2018.12.162⟩
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-02268014
DOI: 10.1016/j.trpro.2018.12.162
Access Statistics for this paper
More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().