An approach for the management of the risk factors impacting the model-based engineering methods in ERP projects
Sarra Mamoghli,
Virginie Goepp-Thiebaud () and
Valérie Botta-Genoulaz ()
Additional contact information
Virginie Goepp-Thiebaud: ICube - Laboratoire des sciences de l'ingénieur, de l'informatique et de l'imagerie - ENGEES - École Nationale du Génie de l'Eau et de l'Environnement de Strasbourg - UNISTRA - Université de Strasbourg - HUS - Les Hôpitaux Universitaires de Strasbourg - INSA Strasbourg - Institut National des Sciences Appliquées - Strasbourg - INSA - Institut National des Sciences Appliquées - CNRS - Centre National de la Recherche Scientifique - MNGE - Matériaux et Nanosciences Grand-Est - UNISTRA - Université de Strasbourg - Université de Haute-Alsace (UHA) - Université de Haute-Alsace (UHA) Mulhouse - Colmar - INSERM - Institut National de la Santé et de la Recherche Médicale - INC-CNRS - Institut de Chimie - CNRS Chimie - CNRS - Centre National de la Recherche Scientifique - Réseau nanophotonique et optique - UNISTRA - Université de Strasbourg - Université de Haute-Alsace (UHA) - Université de Haute-Alsace (UHA) Mulhouse - Colmar - CNRS - Centre National de la Recherche Scientifique
Valérie Botta-Genoulaz: DISP - Décision et Information pour les Systèmes de Production - UL2 - Université Lumière - Lyon 2 - UCBL - Université Claude Bernard Lyon 1 - Université de Lyon - INSA Lyon - Institut National des Sciences Appliquées de Lyon - Université de Lyon - INSA - Institut National des Sciences Appliquées
Post-Print from HAL
Abstract:
A consistent alignment is one of the most critical issues influencing the ERP project's success. We propose, in this paper, a risk factor management approach that contrary to existing ones, links a set of risk factors to their impacts on the misalignment management performed during the business blueprint stage of an ERP project. The proposed approach is composed of three steps: (1) the identification of the risk factors occurring while managing the misalignment; (2) the mitigation of these risk factors; (3) and the treatment of the impact the occurred risk factors have on the misalignment management. The use of the proposed approach is illustrated on a case study in a French small and medium-sized enterprise.
Keywords: ERP project; Business Process Management; Enterprise Resource Planning (ERP); Business Process Modeling; Risk Management (search for similar items in EconPapers)
Date: 2018-06-11
References: Add references at CitEc
Citations:
Published in 16th IFAC Symposium on Information Control Problems in Manufacturing, Jun 2018, Bergamo, Italy. pp.1206-1211, ⟨10.1016/j.ifacol.2018.08.426⟩
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-02410697
DOI: 10.1016/j.ifacol.2018.08.426
Access Statistics for this paper
More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().