EconPapers    
Economics at your fingertips  
 

Planning, policy and integration for sustainable development of offshore wind energy in Vietnam 2022 -2030

Minh Ha-Duong, Sven Teske, Dimitri Pescia and Mentari Pujantoro
Additional contact information
Sven Teske: UTS - University of Technology Sydney
Dimitri Pescia: Agora Energiewende

Post-Print from HAL

Abstract: The wind power sector took off in Vietnam after the feed-in tariff was raised to 8.5 UScents / kWh for onshore projects in 2018. As of March 2021, 113 wind projects with total capacity 6,038MW have signed a power purchase agreement. Most are expected to enter commercial operation before December 2021. We explore here three scenarios for wind power development in Vietnam through 2030. It argues that by 2030 the wind power installed capacity in the New Normal could be around 17 GW onshore and 10 GW offshore. In a Factor Three scenario, offshore wind reaches 21 GW by 2030. This has three policy implications. First, Vietnam's next power development plan provides an important opportunity to increase at low costs the level of ambition of wind power development. Second, flexibility should be the guiding principle of the plan. Third, to realize the large potential of offshore wind power, infrastructure planning has to start soon.

Keywords: Wind energy; Vietnam; scenarios (search for similar items in EconPapers)
Date: 2022-01-01
New Economics Papers: this item is included in nep-ene, nep-env, nep-ppm and nep-sea
Note: View the original document on HAL open archive server: https://enpc.hal.science/hal-03446269v1
References: View references in EconPapers View complete reference list from CitEc
Citations:

Published in Proceedings of the 2nd Vietnam Symposium on Advances in Offshore Engineering (VSOE2021), 208, pp.48-66, 2022, Lecture Notes in Civil Engineering,, ⟨10.1007/978-981-16-7735-9_4⟩

Downloads: (external link)
https://enpc.hal.science/hal-03446269v1/document (application/pdf)

Related works:
Working Paper: Planning, policy and integration for sustainable development of offshore wind energy in Vietnam 2022 - 2030 (2021) Downloads
Working Paper: Planning, policy and integration for sustainable development of offshore wind energy in Vietnam 2022 - 2030 (2021) Downloads
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-03446269

DOI: 10.1007/978-981-16-7735-9_4

Access Statistics for this paper

More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().

 
Page updated 2025-03-22
Handle: RePEc:hal:journl:hal-03446269