Integration of eco-design, through risk management, into the early design phase of defense systems within a project owner and prime contractor relationship
Intégration de l’écoconception par la gestion des risques dans la conception amont de systèmes de défense inscrite dans une relation maître d'ouvrage - maître d’oeuvre industriel
Elise Dupont ()
Additional contact information
Elise Dupont: LGI - Laboratoire Génie Industriel - CentraleSupélec - Université Paris-Saclay
Post-Print from HAL
Date: 2025-10-23
References: Add references at CitEc
Citations:
Published in 2025
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-03596005
Access Statistics for this paper
More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().