Optimal management of flexible nuclear power plants in a decarbonising competitive electricity market: The French case

Maria Lykidi () and Pascal Gourdel ()
Additional contact information
Maria Lykidi: CES - Centre d'économie de la Sorbonne - UP1 - Université Paris 1 Panthéon-Sorbonne - CNRS - Centre National de la Recherche Scientifique
Pascal Gourdel: CES - Centre d'économie de la Sorbonne - UP1 - Université Paris 1 Panthéon-Sorbonne - CNRS - Centre National de la Recherche Scientifique, PSE - Paris School of Economics - UP1 - Université Paris 1 Panthéon-Sorbonne - ENS-PSL - École normale supérieure - Paris - PSL - Université Paris Sciences et Lettres - EHESS - École des hautes études en sciences sociales - ENPC - École nationale des ponts et chaussées - CNRS - Centre National de la Recherche Scientifique - INRAE - Institut National de Recherche pour l’Agriculture, l’Alimentation et l’Environnement

Post-Print from HAL

Abstract: The road towards the decarbonization of electricity leads to high deployment of low-carbon power sources including intermittent energy sources. In this context, flexible nuclear power plants could play a significant role because they do not produce CO2 emissions and under certain conditions flexible operation is necessary to ensure the stability of the electricity grid. Flexible nuclear reactors have the ability to load-follow the predicted fluctuations in demand. However, high fixed costs of nuclear production, tighter regulations since the Fukushima accident and the extensive participation of renewable sources in the energy mix challenge the economic profitability of nuclear production. Consequently, a question that arises is how nuclear power producers can manage flexible nuclear production in order to maximize their profits. We proved that optimal production behaviour is not characterized by constant nuclear production unless further investments in thermal capacity are realized. On the contrary, both nuclear and thermal production are flexible at the optimum level.

Keywords: Electricity production; Nuclear fuel reservoir; Flexible management; Inter-temporal profit maximization problem; Price discontinuity problem; Quadratic programming (search for similar items in EconPapers)
Date: 2017-08
References: Add references at CitEc
Citations: View citations in EconPapers (4)

Published in Energy, 2017, 132, pp.171-185. ⟨10.1016/j.energy.2017.05.065⟩

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-03659252

DOI: 10.1016/j.energy.2017.05.065

Access Statistics for this paper

More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().

 
Page updated 2025-03-19
Handle: RePEc:hal:journl:hal-03659252