Developing separate or integrated configurators? A longitudinal case study
Linda Zhang and
Sara Shafiee
Additional contact information
Linda Zhang: LEM - Lille économie management - UMR 9221 - UA - Université d'Artois - UCL - Université catholique de Lille - Université de Lille - CNRS - Centre National de la Recherche Scientifique
Sara Shafiee: DTU - Danmarks Tekniske Universitet = Technical University of Denmark
Post-Print from HAL
Abstract:
Configurators have the potential to revolutionize the business processes of Engineering-to-order (ETO) companies. Despite their positive impacts on ETO companies' operations and strategies, there is a paucity of empirical investigations examining the development processes and practices of configurators, in particular integrated configurators. We, thus, carry out a longitudinal case study in a large ETO company to study and compare the characteristics and dynamics of the development process of an integrated sales and technical (ST) configurator with these of a sales configurator and a technical configurator. First, the findings uncover the nature of the integrated ST configurator development process in terms of development team formation, development planning activities, processes and activities that went wrong, and unplanned events and their handling. Second, performance evaluation with respect to several criteria contributes to a holistic picture of the development process of the integrated ST configurator. Based on the findings, we further shed light on managerial implications including the business process changes associated with the application of the integrated ST configurator and the need of having a clear, comprehensive project plan before development. To conclude, our study is expected to broaden ETO companies' understanding of the development processes of integrated configurators and to guide them to make wise decisions in developing configurators.
Keywords: Integrated configurators; ngineering-to-order; Longitudinal case study; Project planning; Configurator development (search for similar items in EconPapers)
Date: 2022-07
Note: View the original document on HAL open archive server: https://hal.science/hal-03707380v1
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Published in International Journal of Production Economics, 2022, 249, pp.108517. ⟨10.1016/j.ijpe.2022.108517⟩
Downloads: (external link)
https://hal.science/hal-03707380v1/document (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-03707380
DOI: 10.1016/j.ijpe.2022.108517
Access Statistics for this paper
More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().