Tái khởi động dự án điện hạt nhân: Đọc lại cuốn sách của IAEA
Minh Ha-Duong ()
Additional contact information
Minh Ha-Duong: CIRED - Centre International de Recherche sur l'Environnement et le Développement - Cirad - Centre de Coopération Internationale en Recherche Agronomique pour le Développement - EHESS - École des hautes études en sciences sociales - AgroParisTech - ENPC - École nationale des ponts et chaussées - Université Paris-Saclay - CNRS - Centre National de la Recherche Scientifique
Post-Print from HAL
Abstract:
The article analyzes IAEA's nuclear infrastructure development framework in the context of Vietnam restarting its nuclear program. The framework comprises 19 infrastructure elements developed through 3 milestones. The author compares this process to temple construction, requiring solid foundations and careful architecture. It assesses Vietnam's progress before the 2016 project suspension and current conditions, proposing 6 specific steps for systematically restarting the program.
Date: 2024-12-20
New Economics Papers: this item is included in nep-sea
Note: View the original document on HAL open archive server: https://hal.science/hal-04875078v1
References: Add references at CitEc
Citations:
Published in 2024, pp.8-12
Downloads: (external link)
https://hal.science/hal-04875078v1/document (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-04875078
Access Statistics for this paper
More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().