Construction Costs of High-Speed Railways: A Comparison of France and Italy
Francesco Bruzzone,
Matilde Gasparetto,
Federico Cavallaro,
Louafi Bouzouina,
Michel Khachatryan and
Silvio Nocera
Additional contact information
Francesco Bruzzone: IUAV - Università Iuav di Venezia = Iuav University of Venice
Matilde Gasparetto: IUAV - Università Iuav di Venezia = Iuav University of Venice
Federico Cavallaro: IUAV - Università Iuav di Venezia = Iuav University of Venice
Louafi Bouzouina: LAET - Laboratoire Aménagement Économie Transports - UL2 - Université Lumière - Lyon 2 - ENTPE - École Nationale des Travaux Publics de l'État - CNRS - Centre National de la Recherche Scientifique
Michel Khachatryan: LAET - Laboratoire Aménagement Économie Transports - UL2 - Université Lumière - Lyon 2 - ENTPE - École Nationale des Travaux Publics de l'État - CNRS - Centre National de la Recherche Scientifique
Silvio Nocera: IUAV - Università Iuav di Venezia = Iuav University of Venice
Post-Print from HAL
Abstract:
Like most transport-related megaprojects, decisions for new High-speed Railways (HSR) face criticism and raise questions about their effectiveness. HSR projects frequently encounter construction cost overruns and overestimations of travel demand. France is no exception, although its geographic and social characteristics favor HSR expansion. To analyze the specific conditions in France, this study examines key indicators related to construction costs and user impacts across the French HSR network, with additional consideration of demand implications. The analysis is structured into three phases: preliminary (project proposal), initial (start of construction), and final (operational phase). Findings reveal an average increase in construction costs of 13% from the preliminary to initial phase, followed by a further 5% increase from the initial to final phase. These cost overruns are primarily due to modifications in project plans, such as the addition of stations. Cost increases are more pronounced in recent lines, while older lines (e.g., Paris-Lyon, Paris-Lille) show minimal increases from initial estimates. The study also compares France with Italy, highlighting similarities and differences in design and construction efficiency. The findings provide valuable insights into the expertise and project management capacity of HSR authorities in both countries. In Italy, persistent cost overruns reflect issues in cost forecasting rather than unforeseen events, suggesting that a more rigorous preliminary assessment could lead to more accurate forecasting and smoother project delivery. The French example demonstrates that such an approach is feasible and may reduce stakeholder conflicts.
Keywords: France-Italy comparison; Design and building process; Cost overrunning; Construction costs; High-speed railway (search for similar items in EconPapers)
Date: 2025-05-01
References: Add references at CitEc
Citations:
Published in Francesca Pagliara. Socioeconomic Impacts of High-Speed Rail Systems. IW-HSR 2023. Proceedings of the 4th International Workshop on High-Speed Rail Socioeconomic Impacts, University of Naples Federico II, Italy, International Union of Railways (UIC), 10-11 September 2024, Springer Nature Switzerland, pp.421-435, 2025, Springer Proceedings in Business and Economics, ISBN 978-3-031-82527-9 / eISBN 978-3-031-82528-6. ⟨10.1007/978-3-031-82528-6_21⟩
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-05369216
DOI: 10.1007/978-3-031-82528-6_21