LE CONTROLE DE DEMARRAGE DE LA FABRICATION D'UN NOUVEAU PRODUIT LE CAS EXPLORATOIRE D'UN CONSTRUCTEUR AUTOMOBILE
Asms Ben Temellist
Additional contact information
Asms Ben Temellist: CREFIGE - Centre Européen de Recherche en Finance et Gestion - Université Paris Dauphine-PSL - PSL - Université Paris Sciences et Lettres
Post-Print from HAL
Abstract:
The aim of this paper is to identify the process of control regarding the start-up of production phase, and particularly the cost – time – quality triangle. The exploratory case study carried upon a French auto maker revealed that two processes are used: the organizational learning and an efficient economic monitoring system. . Based on the framework of Simons (1995), our study reveals a complementarity between diagnostic control system and interactive control system. However, the joint control of QCD triangle remains relatively impractical.
Keywords: Time; Cost; Quality triangle; Start-up of production phase; interactive control; organizational learning; arbitration; automaker; Démarrage de la production; contrôle interactif; apprentissage organisationnel; QCD; arbitrage; constructeur automobile. (search for similar items in EconPapers)
Date: 2009-05-27
Note: View the original document on HAL open archive server: https://shs.hal.science/halshs-00460148v1
References: View references in EconPapers View complete reference list from CitEc
Citations:
Published in La place de la dimension européenne dans la Comptabilité Contrôle Audit, May 2009, Strasbourg, France. pp.CD ROM
Downloads: (external link)
https://shs.hal.science/halshs-00460148v1/document (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:halshs-00460148
Access Statistics for this paper
More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().