Tips and Pitfalls in PPP design

Emile Quinet and David Meunier ()
Additional contact information
Emile Quinet: PSE - Paris-Jourdan Sciences Economiques - ENS-PSL - École normale supérieure - Paris - PSL - Université Paris Sciences et Lettres - INRA - Institut National de la Recherche Agronomique - EHESS - École des hautes études en sciences sociales - ENPC - École nationale des ponts et chaussées - CNRS - Centre National de la Recherche Scientifique, PSE - Paris School of Economics - UP1 - Université Paris 1 Panthéon-Sorbonne - ENS-PSL - École normale supérieure - Paris - PSL - Université Paris Sciences et Lettres - EHESS - École des hautes études en sciences sociales - ENPC - École nationale des ponts et chaussées - CNRS - Centre National de la Recherche Scientifique - INRAE - Institut National de Recherche pour l’Agriculture, l’Alimentation et l’Environnement
David Meunier: LVMT - Laboratoire Ville, Mobilité, Transport - IFSTTAR - Institut Français des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux - UPEM - Université Paris-Est Marne-la-Vallée - ENPC - École nationale des ponts et chaussées, INRETS - Institut National de Recherche sur les Transports et leur Sécurité

Post-Print from HAL

Abstract: The Public-Private-Partnership (PPP) procedure is a very appealing model, but as it becomes more and more used in practice, problems and failures have been observed in the management of many projects. Many of these unfortunate experiences are consequences of errors in the implementation of the procedure, but in other cases, clear errors of conception were the cause. Indeed, there are many ways to structure a PPP and PPP is not the only way to manage an infrastructure scheme. It is thus an important task to provide guidelines on whether to use PPP or other types of procurement and, in case a PPP is preferred, on how to design it. The aim of this chapter is to contribute to this task, trying to combine theoretical knowledge and practical experience. After a review of the variety of economic characteristics of transport infrastructure and their procurement conditions, we recall the reasons that may justify this association of public and private management which is the characteristic of PPP, outlining the limits of using pure private or pure public procurement. Then an analytic process is proposed, screening the parameters which matter most for choosing the PPP procedure among many possible ones, depending on the specificities of the various transport modes. This process gives also indications on key elements for implementing a PPP. Finally, the analytic process proposed is used for a generic analysis of, respectively, the motorways and port sectors, so as to test its practicability and customizing capability for the use of public authorities.

Keywords: Procurement; Information; Risks; Contracts (search for similar items in EconPapers)
Date: 2010-11
References: Add references at CitEc
Citations: View citations in EconPapers (4)

Published in Research in Transportation Economics, 2010, 30 (1), pp.126-138. ⟨10.1016/j.retrec.2010.10.013⟩

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:halshs-00754415

DOI: 10.1016/j.retrec.2010.10.013

Access Statistics for this paper

More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().

 
Page updated 2025-03-19
Handle: RePEc:hal:journl:halshs-00754415