Cost of Power Outages for Manufacturing Firms in Ethiopia: A Stated Preference Study
Fredrik Carlsson,
Eyoual Demeke (),
Peter Martinsson and
Tewodros Tesemma ()
Additional contact information
Eyoual Demeke: Department of Economics, School of Business, Economics and Law, Göteborg University, Postal: P.O. Box 640, SE 40530 GÖTEBORG, Sweden, https://www.economics.gu.se
Tewodros Tesemma: Department of Economics, School of Business, Economics and Law, Göteborg University, Postal: P.O. Box 640, SE 40530 GÖTEBORG, Sweden, https://www.economics.gu.se
No 731, Working Papers in Economics from University of Gothenburg, Department of Economics
Abstract:
Having a reliable supply of electricity is essential for the operation of any firm. In most developing countries, however, electricity supply is highly unreliable. In this study, we estimate the cost of power outages for micro, small, and medium-sized enterprises in Addis Ababa, Ethiopia, using a stated preference survey. We find that the willingness to pay, and thus the cost of power outages, is substantial. The estimated willingness to pay for a reduction of one power outage corresponds to a tariff increase of 16 percent. The willingness to pay for reducing the average length of a power outage by one hour corresponds to a 33 percent increase. The compensating variation for a zero-outage situation corresponds to about three times the current electricity cost. There is, however, considerable heterogeneity in costs across sectors, firm sizes, and levels of electricity consumption. Policy makers could consider this observed heterogeneity when it comes to aspects such as where to invest to improve reliability and different types of electricity contracts.
Keywords: power outages; willingness to pay; choice experiment; Ethiopia (search for similar items in EconPapers)
JEL-codes: D22 Q41 (search for similar items in EconPapers)
Pages: 26 pages
Date: 2018-05
New Economics Papers: this item is included in nep-ene
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://hdl.handle.net/2077/56337 Full text (text/html)
Related works:
Journal Article: Cost of power outages for manufacturing firms in Ethiopia: A stated preference study (2020) 
Working Paper: Cost of Power Outages for Manufacturing Firms in Ethiopia: A Stated Preference Study (2018) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hhs:gunwpe:0731
Ordering information: This working paper can be ordered from
Access Statistics for this paper
More papers in Working Papers in Economics from University of Gothenburg, Department of Economics Department of Economics, School of Business, Economics and Law, University of Gothenburg, Box 640, SE 405 30 GÖTEBORG, Sweden. Contact information at EDIRC.
Bibliographic data for series maintained by Jessica Oscarsson ().