Forcasting in large cointegrated processes
Hiroaki Chigira and
Taku Yamamoto
Hi-Stat Discussion Paper Series from Institute of Economic Research, Hitotsubashi University
Abstract:
It is widely recognized that taking cointegration relationships into consideration is useful in forecasting cointegrated processes. However, there are a few practical problems when forecasting large cointegrated processes using the well-known vector error correction model. First, it is hard to identify the cointegration rank in large models. Second, since the number of parameters to be estimated tends to be large relative to the sample size in large models, estimators will have large standard errors, and so will forecasts. The purpose of the present paper is to propose a new procedure for forecasting large cointegrated processes, which is free from the above problems. In our Monte Carlo experiment, we find that our forecast gains accuracy when we work with a larger model as long as the ratio of the cointegration rank to the number of variables in the process is high.
Keywords: Forcasting; Cointegration; Large Models (search for similar items in EconPapers)
JEL-codes: C12 C32 (search for similar items in EconPapers)
Date: 2006-06
New Economics Papers: this item is included in nep-ecm, nep-ets and nep-for
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hi-stat.ier.hit-u.ac.jp/research/discussion/2006/pdf/D06-169.pdf (application/pdf)
Related works:
Journal Article: Forecasting in large cointegrated processes (2009) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hst:hstdps:d06-169
Access Statistics for this paper
More papers in Hi-Stat Discussion Paper Series from Institute of Economic Research, Hitotsubashi University Contact information at EDIRC.
Bibliographic data for series maintained by Tatsuji Makino ().