Estimating Multiproduct Costs when Some Outputs Are Not Produced
Quinn Weninger ()
Staff General Research Papers Archive from Iowa State University, Department of Economics
Abstract:
Pooling diversified and specialized firm data to analyze multiproduct cost technologies raises two issues in applied research: (1) a functional form must be specified that accommodates zero outputs, and (2) assumptions must be made regarding the structure of the multiproduct technology when some outputs are not produced. This article introduces a methodology to estimate the translog multiproduct cost function in the presence of zero outputs. The method adds flexibility to allow for and test competing structural assumptions. The added flexibility can improve measurement of the global properties of multiproduct cost structures. An application to a cross section of U.S. railway firms demonstrates the key advantages.
Date: 2003-11-01
New Economics Papers: this item is included in nep-agr and nep-eff
References: Add references at CitEc
Citations: View citations in EconPapers (11)
Published in Empirical Economics, November 2003, vol. 28 no. 4, pp. 753-765
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
Journal Article: Estimating multiproduct costs when some outputs are not produced (2003) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:isu:genres:10830
Access Statistics for this paper
More papers in Staff General Research Papers Archive from Iowa State University, Department of Economics Iowa State University, Dept. of Economics, 260 Heady Hall, Ames, IA 50011-1070. Contact information at EDIRC.
Bibliographic data for series maintained by Curtis Balmer ().