Multi-level governance of large transport infrastructures: efficiency or transparency?

Davide Sartori ()
Additional contact information
Davide Sartori: CSIL Centre for Industrial Studies, https://www.csilmilano.com/

Working Papers from CSIL Centre for Industrial Studies

Abstract: The present paper analyses the Multi-level Governance issue for large transport infrastructures relevant at European level. The focus is put on the activities occurring before the infrastructure implementation, which are identified as the decision making-process. This is commonly a long and complex procedure involving a variety of stakeholders at different levels and a variety of corresponding interests and objectives. This procedure should ensure that the effects the project will generate are assessed taking into account all the stakeholders concerned (transparency) and, at the same time, it should avoid paralysis or delays caused by excessive discussions (efficiency). Five major transport projects have been examined to investigate the main features of the decision-making process, to capture the differences occurring between projects belonging to different countries and to understand how the process may influence the project’s economic performance. All selected projects have both a supranational and national relevance, because they have been included in a Master Plan at national level, but are also part of the Trans-European Transport Network. Evidence from selected cases highlighted that projects belonging to the same country follow very similar processes. This is particularly evident in the German and French cases, where national standard procedures are established in advance by the transport planning authority. When country-specific decision-making processes exist, these tend to ensure that the project-financing decision is taken when all the project’s promoters have been consulted and when the requested information and analyses have been undertaken and submitted. This tendency can, however, lead to a lengthening of the process and delays in the infrastructure’s implementation, which have a negative effect on the investment cost. On the contrary, in the case of projects belonging to two or more countries, no homogeneous procedure is followed and the duplication of tasks and entities (in order to have all countries controlling the process) makes the project management rather difficult.

Keywords: Multi-level Governance; decision-making process; transport (search for similar items in EconPapers)
JEL-codes: H43 H54 I30 (search for similar items in EconPapers)
Pages: 27 pages
Date: 2008-05-01
References: View complete reference list from CitEc
Citations: View citations in EconPapers (4)

Downloads: (external link)
https://www.csilmilano.com/docs/WP09_2009.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:mst:wpaper:200909

Access Statistics for this paper

More papers in Working Papers from CSIL Centre for Industrial Studies Contact information at EDIRC.
Bibliographic data for series maintained by Marinella Manghina ().

 
Page updated 2025-03-30
Handle: RePEc:mst:wpaper:200909