The cost of building and operating a new high speed rail line
Javier Campos,
Ginés de Rus and
Iñaki Barron
MPRA Paper from University Library of Munich, Germany
Abstract:
What is the total cost of building, maintaining and operating a new high speed rail (HSR) line? Trying to answer this question is the main objective of this paper. To address it we will make an extensive use a database containing information about 166 actual HSR projects in 20 countries is analysed in detail. This database provides a rough guide about the typical cost structure of any HSR project and suggests tentative estimates for some representative unit values of those costs. This information, together with some additional values gathered from other sources allow us to perform a simple simulation exercise capable not only of providing an answer to the initial question, but also of offering insights on the relevance of some elements in determining the total costs of a HSR line.
Keywords: Transport costs; High speed rail (search for similar items in EconPapers)
JEL-codes: L90 L92 (search for similar items in EconPapers)
Date: 2007
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
https://mpra.ub.uni-muenchen.de/12396/1/MPRA_paper_12396.pdf original version (application/pdf)
https://mpra.ub.uni-muenchen.de/38676/1/MPRA_paper_38676.pdf revised version (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pra:mprapa:12396
Access Statistics for this paper
More papers in MPRA Paper from University Library of Munich, Germany Ludwigstraße 33, D-80539 Munich, Germany. Contact information at EDIRC.
Bibliographic data for series maintained by Joachim Winter ().