Bidding hydropower generation: Integrating short- and long-term scheduling
Stein-Erik Fleten,
Daniel Haugstvedt,
Jens Arne Steinsbø,
Michael Belsnes and
Franziska Fleischmann
MPRA Paper from University Library of Munich, Germany
Abstract:
Bidding of flexible reservoir hydropower in day-ahead (spot) auctions needs to be done under uncertainty of electricity prices and inflow to reservoirs. The presence of reservoirs also means that the short-term problem of determining bids for the next 12–36 hours is a part of a long term problem in which the question is whether to release water now or store it for the future. This multi-scale challenge is usually addressed by using several models for hydropower planning, at least one long-term model and one short-term model. We present a multistage stochasticmixed integer programming model that has a fine time resolution on near term, and a coarser resolution going forward. It handles price as a stochastic parameter and assumes deterministic inflow as it is intended for use in the winter season.
Keywords: Hydropower scheduling; bidding strategies; stochastic programming (search for similar items in EconPapers)
JEL-codes: C61 D8 Q25 Q4 (search for similar items in EconPapers)
Date: 2011
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
https://mpra.ub.uni-muenchen.de/44450/1/MPRA_paper_44450.pdf original version (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pra:mprapa:44450
Access Statistics for this paper
More papers in MPRA Paper from University Library of Munich, Germany Ludwigstraße 33, D-80539 Munich, Germany. Contact information at EDIRC.
Bibliographic data for series maintained by Joachim Winter ().