Will the Market Get it Right? The Placing of New Power Plants in Germany
Kristin Dietrich,
Florian Leuthold and
Hannes Weigt
MPRA Paper from University Library of Munich, Germany
Abstract:
This paper applies ELMOD, an economic-engineering model of the European electricity market to the issue of optimal investment placing of generation capacity in Germany under different market integration scenarios. The model is formulated as cost minimization approach. We conduct a scenario analysis comparing different rules for power plant placing in a national, a market-coupling and an integrated EU market approach. We find that there are great benefits for consumers and producers if taking into account network conditions and cross border congestion in generation location planning. Moreover a change from national planning to an integrated market planner perspective shows even more improvements in prices and network utilization.
Keywords: electricity; investment; generation; Germany (search for similar items in EconPapers)
JEL-codes: D61 L51 L94 (search for similar items in EconPapers)
Date: 2009-04
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Published in Zeitschrift für Energiewirtschaft 4.34(2010): pp. 255-265
Downloads: (external link)
https://mpra.ub.uni-muenchen.de/65653/1/wp_em_32_D ... er_plant_placing.pdf original version (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pra:mprapa:65653
Access Statistics for this paper
More papers in MPRA Paper from University Library of Munich, Germany Ludwigstraße 33, D-80539 Munich, Germany. Contact information at EDIRC.
Bibliographic data for series maintained by Joachim Winter ().