Causes of slow and low disbursement in donor funded projects in Sub–Saharan Africa: Evidence from Uganda
Milton Ayoki
MPRA Paper from University Library of Munich, Germany
Abstract:
In this paper, we document the experience with donor funded projects in Uganda, identifying both factors that contributed to its success and that hindered its effectiveness. We find problem of low/slow disbursement to be associated with funds procedures and conditions attached to specific projects, including the counter-part funding requirement; conditions for aid effectiveness; deficiencies in procurement planning and failure to follow the conditionality and funding guidelines on procurement procedures. The ranking of these problems do vary from project to project. The weak project implementation capacity (capacity constraints) implies that attention needs to be focused on building capacity of technical staff especially in those projects with elaborate procedures such as the World Bank IDA/IBRD projects.
Keywords: Slow disbursements; donor funded projects; sub-Saharan Africa; Uganda (search for similar items in EconPapers)
JEL-codes: F34 F35 H63 (search for similar items in EconPapers)
Date: 2008-06
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://mpra.ub.uni-muenchen.de/87106/1/MPRA_paper_87106.pdf original version (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pra:mprapa:87106
Access Statistics for this paper
More papers in MPRA Paper from University Library of Munich, Germany Ludwigstraße 33, D-80539 Munich, Germany. Contact information at EDIRC.
Bibliographic data for series maintained by Joachim Winter ().