Challenges in the Evaluation of Ultra-Long-Lived Projects: Risk Premia for Projects with Eternal Returns or Costs
Wilko Rohlfs () and
Reinhard Madlener
Additional contact information
Wilko Rohlfs: RWTH Aachen University, Postal: Institute of Heat and Mass Transfer, Faculty of Mechanical Engineering, Eilfschornsteinstrasse 16, 52056 Aachen, Germany
No 13/2013, FCN Working Papers from E.ON Energy Research Center, Future Energy Consumer Needs and Behavior (FCN)
Abstract:
The economic evaluation of ultra-long-lived investment projects is not only challenging due to the choice of the planning horizon but also due to the discounting of future uncertain cash flows. Thus, for real world investment decisions a better understanding of the project’s risks and their effect on the project’s value is crucial. If long-term investments are modeled, stochastic processes may be used to reflect the uncertain development of future prices and cash flows. The choice of the stochastic process is consequently an essential assumption in the modeling process. This paper critically discusses the risk of ultra-long-lived investment projects implied if future pay-off’s are assumed to follow geometric Brownian motion processes. In our analysis, we distinguish between projects driven by costs and such driven by revenues. For both kind of projects we compare the value at risk with the returns of a risk-free asset. Therein, the value at risk describes the threshold value of the confidence levels of the uncertain cash flow’s probability density function. The comparison for long time horizons shows that the lower confidence interval exceeds the returns of a risk-free asset used as a benchmark for any choice of the confidence level, which implies that the returns of a “worst-case” scenario (within the assumed confidence interval) will still exceed the returns of a risk-free asset in the long-term perspective. For the case of uncertain future cost, the risk measure is defined as the difference between the expected value and the boundary of the confidence interval. This value is also found to become negative in the long-term perspective.
Keywords: Ultra-long-lived projects; discounting; risk evaluation (search for similar items in EconPapers)
Pages: 27 pages
Date: 2013-08
New Economics Papers: this item is included in nep-ppm
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://www.fcn.eonerc.rwth-aachen.de/global/show_document.asp?id=aaaaaaaaaagvwbm Full text (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ris:fcnwpa:2013_013
Access Statistics for this paper
More papers in FCN Working Papers from E.ON Energy Research Center, Future Energy Consumer Needs and Behavior (FCN) Contact information at EDIRC.
Bibliographic data for series maintained by Hendrik Schmitz ().