Offshoring Along the Production Chain
Philipp Harms,
Oliver Lorz and
Dieter Urban
No 09.01, Working Papers from Swiss National Bank, Study Center Gerzensee
Abstract:
Recent contributions on offshoring often assume that firms can freely split their production process into separate steps which can be ranked according to the cost savings from producing abroad. We replace this assumption by the notion of a technologically determined sequence of production steps. In our model, cost savings from offshoring fluctuate along the production chain, and moving unfinished goods across borders causes transport costs. We show that, in such a setting, firms may refrain from offshoring even if relocating individual steps would be advantageous in terms of offshoring costs, or they may offshore (almost) the entire production chain to save transport costs. Small variations in model parameters may have a substantial impact on offshoring activities.
Pages: 22 pages
Date: 2009-04
References: Add references at CitEc
Citations: View citations in EconPapers (21)
Downloads: (external link)
http://www.szgerzensee.ch/fileadmin/Dateien_Anwend ... g_papers/wp-0901.pdf Full text (application/pdf)
None
Related works:
Journal Article: Offshoring along the production chain (2012) 
Journal Article: Offshoring along the production chain (2012) 
Working Paper: Offshoring along the Production Chain (2009) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:szg:worpap:0901
Ordering information: This working paper can be ordered from
Studienzentrum Gerzensee, Postfach 21, 3115 Gerzensee
The price is Free.
Access Statistics for this paper
More papers in Working Papers from Swiss National Bank, Study Center Gerzensee Studienzentrum Gerzensee, Postfach 21, 3115 Gerzensee.
Bibliographic data for series maintained by library ().