Dominion Virginia Power and Clean Power Plan Costs: A brief review of the Dominion Power 2015 Integrated Resource Plan compliance cost estimates
William Shobe
No 2015-02, Reports from Center for Economic and Policy Studies
Abstract:
Dominion Virginia Power's 2015 Integrated Resource Plan filed with the State Corporation Commission presents cost estimates for complying with the proposed federal regulations, known as the Clean Power Plan (CPP), that force reductions in greenhouse gas emissions from existing power plants. The IRP incorrectly attributes to the CPP costs that would occur with or without the CPP. This and other modeling choices result in substantially overstated estimates of compliance costs.
Keywords: Dominion Power; energy; clean power plan; Virginia; climate change (search for similar items in EconPapers)
JEL-codes: Q4 Q5 (search for similar items in EconPapers)
Date: 2015-01-08
New Economics Papers: this item is included in nep-ene and nep-env
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://econ.ccps.virginia.edu/RePEc_docs/ceps_docs/DOM_2015_IRP_review.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:vac:report:rpt15-02
Access Statistics for this paper
More papers in Reports from Center for Economic and Policy Studies 400206 Charlottesville VA 22904. Contact information at EDIRC.
Bibliographic data for series maintained by William M. Shobe ().