EconPapers    
Economics at your fingertips  
 

A note on "hierarchical models for multi-project planning and scheduling"

Sönke Hartmann and Arno Sprecher

No 338, Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel from Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre

Abstract: We consider the multi-mode resource-constrained project scheduling problem. The focus is on an algorithm which is supposed to find a makespan optimal solution. This algorithm has been presented in a recent paper by Speranza and Vercellis. The correctness of the algorithm is examined. Moreover, two counterexamples in which the algorithm does not lead to an existing optimal solution are presented.

Keywords: Project scheduling; resource constraints; multiple modes; tight schedules (search for similar items in EconPapers)
Date: 1993
References: Add references at CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
https://www.econstor.eu/bitstream/10419/155414/1/manuskript_338.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:zbw:cauman:338

Access Statistics for this paper

More papers in Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel from Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre Contact information at EDIRC.
Bibliographic data for series maintained by ZBW - Leibniz Information Centre for Economics (econstor@zbw-workspace.eu).

 
Page updated 2025-03-20
Handle: RePEc:zbw:cauman:338