Abstract:
Lot sizing when done for the short-term heavily interacts with the sequencing decisions for the operations to be performed. Especially for real-world situations where capacities are scarce, demand is dynamic, and precedence relations among the operations have to be taken into account the MRP II logic which is implemented in most production planning systems does not satisfy. In this paper, we will reveal the shortcomings of MRP II by means of an example. A mixed-integer programming model is then defined to specify the problem of capacitated, dynamic, multi-level Iot sizing and scheduling. Also, we present a generic solution method (a so-called meta-method) which may be used as a basis of more advanced implementations that may replace the traditional MRP II Systems.
Date: 1996
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.econstor.eu/bitstream/10419/149035/1/manuskript_404.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:zbw:cauman:404
Access Statistics for this paper
More papers in Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel from Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre Contact information at EDIRC.
Bibliographic data for series maintained by ZBW - Leibniz Information Centre for Economics ().