Short-term management of lot production
Alf Kimms
No 480, Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel from Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre
Abstract:
This contribution presents an efficient solution method for solving the major short-term planning problems which occur, if lot production has to be managed. In our focus are the two most important aspects, i.e. lot sizing and scheduling. Since both problems heavily interact, we propose an approach which solves these problems simultaneously. This is in contrast to what traditional Manufacturing Resource Planning (MRP II) logic suggests. But, since we pay special attention on complex product structures and several scarce resources, our approach dominates MRP II. A computational study reveals that suboptimal results within the 6.6% scope from the optimum are obtained within less than half a second for small instances.
Keywords: Production Management; MRP II; Lot Sizing; Scheduling; Complex Product Structures; Multiple Scarce Resources; Dynamic Demand (search for similar items in EconPapers)
Date: 1998
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.econstor.eu/bitstream/10419/147583/1/manuskript_480.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:zbw:cauman:480
Access Statistics for this paper
More papers in Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel from Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre Contact information at EDIRC.
Bibliographic data for series maintained by ZBW - Leibniz Information Centre for Economics ().