Four cases of production-installation simulation for free-form concrete panels

Jeeyoung Lim, Liu Yue, Youngju Na and Sunkuk Kim
Additional contact information
Jeeyoung Lim: Department of Architectural Engineering, Kyung Hee University, Republic of Korea
Liu Yue: Department of Architectural Engineering, Kyung Hee University, Republic of Korea
Youngju Na: Department of Architectural Engineering, Kyung Hee University, Republic of Korea
Sunkuk Kim: Department of Architectural Engineering, Kyung Hee University, Republic of Korea

Journal of Advances in Technology and Engineering Research, 2016, vol. 2, issue 1, 22-27

Abstract: The demand for free-form buildings has increased, yet it has several issues, including the increased cost and duration and decreased constructability, owing to difficulties in producing and installing members of building surface. To solve these problems, a technology to produce FCP using a CNC machine was developed. The technology is delivering the free-form building information to the CNC machine and creating PCM shapes by the delivered information. Such PCM acts as a mold to produce FCP. Efficiency of FCP production-installation is critical in applying this technology since the construction site, duration and project costs are limited. Thus, the purpose of this study is on four cases of production-installation simulation for Free-Form Concrete Panels. The factors that influence FCP production-installation are analyzed and 4 simulation models are proposed using the equation to estimate the time required for FCP productioninstallation. Through simulations, the factor that has the biggest influence on FCP production-installation can be identified, which is likely to reduce the construction duration when the technology is adopted on site. Further simulations considering not only the construction duration, but also cost and quality are needed, and such should be verified through technology application on site.

Keywords: FCP (Free-form Concrete Panels); Schedule Estimation; Simulation Model; Production-Installation; PCM (Phase Change Material) (search for similar items in EconPapers)
Date: 2016
References: Add references at CitEc
Citations: View citations in EconPapers (4)

Downloads: (external link)
https://tafpublications.com/platform/Articles/full-jater2.1.5.php (application/pdf)
https://tafpublications.com/gip_content/paper/jater-2.1.5.pdf (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:apb:jaterr:2016:p:22-27

DOI: 10.20474/jater-2.1.5

Access Statistics for this article

Journal of Advances in Technology and Engineering Research is currently edited by A/Professor Akbar A. Khatibi

More articles in Journal of Advances in Technology and Engineering Research from A/Professor Akbar A. Khatibi Calle Alarcon 66, Sant Adrian De Besos 08930, Barcelona Spain.
Bibliographic data for series maintained by A/Professor Akbar A. Khatibi ().

 
Page updated 2025-03-19
Handle: RePEc:apb:jaterr:2016:p:22-27