Reformbedarf bei den Bundesfernstraßen und das Potential des PPP-Ansatzes
Thorsten Beckers (tb@wip.tu-berlin.de),
Christian von Hirschhausen (cvh@mailbox.tu-dresden.de) and
Jan Peter Klatt (jpk@wip.tu-berlin.de)
Additional contact information
Thorsten Beckers: Workgroup for Infrastructure Policy (WIP), Technische Universität Berlin
Christian von Hirschhausen: Chair of Energy Economics and Public Sector Management, Technische Universität Dresden
Jan Peter Klatt: Workgroup for Infrastructure Policy (WIP), Technische Universität Berlin
No 2006-03, Working Papers from Center for Network Industries and Infrastructure (CNI)
Abstract:
This article analyzes the efficiency impacts of PPP-projects in the highway sector. The economic analysis concludes that the PPP-approach should primarily be considered as an alternative procurement strategy. PPP can be suitable for the new built, extension and renewal of certain highway stretches to reduce costs, whereas the application of the PPP approach for entire networks seems to go along with cost increases. For achieving the potential cost reductions in PPPs for stretches, risks should be allocated in an efficient way between the involved parties, and tendering procedures should be competitive. Apart from that, well-elaborated contracts as well as credible and stable public institutions in charge of preparing, tendering and monitoring the projects are necessary to ensure the success of PPPs. It is also found that concession models which combine the PPP-approach with a remuneration of the concessionaire based on user payments are not an appropriate instrument to solve financial problems in the highway network; they should only be considered in exceptional cases for stretches with little traffic deviation in the case of tolling. The lack of funding in the German federal trunk road sector should rather be addressed by the implementation of a road fund which should receive earmarked user charges. A further result is that the current PPP-models in Germany (A-Model, F-Model, and Functional Construction Contract) feature some design deficits and need to be adapted in order to achieve the goal of increased cost efficiency.
Keywords: PPP; concessions; highways; road fund; Germany (search for similar items in EconPapers)
JEL-codes: D23 H40 L92 (search for similar items in EconPapers)
Pages: 40 pages
Date: 2006-06-19
New Economics Papers: this item is included in nep-ppm
References: Add references at CitEc
Citations:
Published in Zeitschrift für Verkehrswissenschaft (ZfV), Vol. 77 Issue 2, S.105-142
Downloads: (external link)
http://www.cni.tu-berlin.de/fileadmin/documents/Re ... ni_wp_no_2006-03.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cni:wpaper:2006-03
Access Statistics for this paper
More papers in Working Papers from Center for Network Industries and Infrastructure (CNI) Contact information at EDIRC.
Bibliographic data for series maintained by Fabian Kirsch (fabian.kirsch@cni.tu-berlin.de this e-mail address is bad, please contact repec@repec.org).