Strengthening Connectivity for Trade and Development: An Assessment of the Southern Asian Container Rail Corridor
Anil Kumar Gupta (),
Saroj Ayush () and
Joseph George ()
Additional contact information
Anil Kumar Gupta: United Nations Economic and Social Commission for Asia and the Pacific (ESCAP) South and South-West Asia Office
Saroj Ayush: The World Bank
Joseph George: United Nations Economic and Social Commission for Asia and the Pacific (ESCAP) South and South-West Asia Office
No 1901, Development Papers from United Nations Economic and Social Commission for Asia and the Pacific (ESCAP) South and South-West Asia Office
Abstract:
Limitations of cross-border transport connectivity has been observed to have curtailed the full potential of trade led development in the Southern Asian subregion. Inefficiencies of international transport has hurt the trade prospects of not only Southern Asian countries but also trading partners from neighboring subregions, especially the landlocked countries of South and Central Asia which could use well-functioning Southern Asian transport corridors to the advantage of all. UNESCAP has proposed operationalization of a trunk Southern Asian transport route, namely the Istanbul–Tehran–Islamabad– Delhi–Kolkata–Dhaka-Yangon (ITI–DKD-Y) Container Rail Corridor, opening possibilities of new cost-effective transport options. This paper undertakes an assessment of the operational feasibility of this trunk corridor, and finds significant cost and time advantages. Comparing with existing alternative transport options, which often involve circuitous carriageways and transshipment delays, usage of even partial segments of the ITI-DKD-Y Corridor can lead to cost reduction to the tune of US$ 1122 per container (twenty-foot equivalent unit), potentially halving the current costs under modest assumptions. In certain segments, such as Delhi-Lahore, the rate of savings could be as high as 80 percent. Such high rates of cost reduction could translate into savings worth over 50 percent in transaction cost for regular cargo rail services between segments. Besides cost reduction, such services could also yield considerable time savings compared to available alternatives. In certain segments, the delivery time could be reduced by up to 14 days. Activation of end-to-end rail service along the ITI-DKD-Y route, along with multimodal transit linkages to landlocked countries at strategic terminals in the route, can maximize traffic volumes and revenues. Operationalization of the corridor requires concerted efforts to build institutional collaboration, facilitation of container train operators, introduction of container interchange protocols, usage of ICT tools, development of strategic dry ports for intermodal connectivity and adoption of a connectivity master plan.
Keywords: Regional Transport Connectivity; Southern Asia; Container Rail Corridor (search for similar items in EconPapers)
JEL-codes: F15 R11 R41 R42 (search for similar items in EconPapers)
Pages: 30 pages
Date: 2019-01
New Economics Papers: this item is included in nep-tre
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.unescap.org/sites/default/files/SSWA%2 ... l%20Paper_200519.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eap:sswadp:dp1901
Access Statistics for this paper
More papers in Development Papers from United Nations Economic and Social Commission for Asia and the Pacific (ESCAP) South and South-West Asia Office Contact information at EDIRC.
Bibliographic data for series maintained by United Nations Economic and Social Commission for Asia and the Pacific (ESCAP) South and South-West Asia Office ().