The future role of Power-to-Gas in the energy transition: Regional and local techno-economic analyses in Baden-Württemberg

R.C. McKenna, Q. Bchini, J.M. Weinand, J. Michaelis, S. König, W. Köppel and W. Fichtner

Applied Energy, 2018, vol. 212, issue C, 386-400

Abstract: This paper analyses the potential of the Power-to-Gas (PtG) concept in Baden-Württemberg (BW), south west Germany. A macroeconomic analysis shows that a cost-covering operation of PtG for hydrogen production is first possible under our assumptions in 2030. Previous model-based analyses for Germany identified locations, mainly in north-west Germany, where these plants could achieve these full load hours and thus be economical in the future energy system by 2040. Importantly, although some short-term storage devices (batteries) are installed in BW in this scenario, no PtG plants are seen at the level of the transport network. A more detailed analysis for BW at the municipality level develops residual load profiles for individual 110 kV transformers and municipalities. A very large increase in the residual load profiles in the north-east of Baden-Württemberg by 2040 is encountered, suggesting a requirement for network strengthening and local storage, including PtG, in this area. Four very different and representative model regions are further analysed, whereby only Aalen, a region with large wind potentials in the north east of BW, is identified as having significant potentials for PtG by 2040 (between 69 and 155 MWel). The current restrictions for injecting hydrogen into the gas network (2–10% by volume) mean that these PtG plants would have to incorporate a methanation step in order to upgrade and feed in SNG. The generation of SNG on a local level is therefore expected to be an option by about 2040, if the development of renewable energy generation proceeds as quickly as expected in the current energy-political scenario explored here. The existing CO2 sources for methanation are not located in the vicinity of the expected PtG plants, so that a CO2 separation from the air and/or a liquefied transport could be most economical. Further work is required to consider the local energy infrastructure, especially electrical and gas distribution networks.

Keywords: Power-to-Gas; Hydrogen; Synthetic Natural Gas (SNG); Electrolysis; Techno-economic analysis; Energy system analysis; Potential assessment (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (47)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0306261917317312
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:appene:v:212:y:2018:i:c:p:386-400

Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/journaldescription.cws_home/405891/bibliographic
http://www.elsevier. ... 405891/bibliographic

DOI: 10.1016/j.apenergy.2017.12.017

Access Statistics for this article

Applied Energy is currently edited by J. Yan

More articles in Applied Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:appene:v:212:y:2018:i:c:p:386-400