Minimizing a quadratic function of job lateness on a single machine
Sushil K. Gupta and
Tapan Sen
Engineering Costs and Production Economics, 1983, vol. 7, issue 3, 187-194
Date: 1983
References: Add references at CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0167-188X(83)90012-5
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ecpeco:v:7:y:1983:i:3:p:187-194
Access Statistics for this article
Engineering Costs and Production Economics is currently edited by R. W. Grubbström
More articles in Engineering Costs and Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().