EconPapers    
Economics at your fingertips  
 

Minimizing a quadratic function of job lateness on a single machine

Sushil K. Gupta and Tapan Sen

Engineering Costs and Production Economics, 1983, vol. 7, issue 3, 187-194

Date: 1983
References: Add references at CitEc
Citations: View citations in EconPapers (5)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0167-188X(83)90012-5
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ecpeco:v:7:y:1983:i:3:p:187-194

Access Statistics for this article

Engineering Costs and Production Economics is currently edited by R. W. Grubbström

More articles in Engineering Costs and Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ecpeco:v:7:y:1983:i:3:p:187-194