Comparison of exergoeconomic analysis of two different perlite expansion furnaces
Mert Gürtürk,
Hakan F. Oztop and
Arif Hepbasli
Energy, 2015, vol. 80, issue C, 589-598
Abstract:
In this study, exergoeconomic analyses of two different perlite expansion furnaces are performed based on the actual operational data. The exergy cost and the cost per unit of exergy of the expanded perlite produced by the Former Perlite Expansion Furnace (FPEF) are determined to be 62.886 US$/h and 648.309 US$/GJ while those produced by the New Perlite Expansion Furnace (NPEF) are obtained to be 106.734 US$/h and 503.463 US$/GJ, respectively. Additionally, the production costs based on exergy are calculated to be 0.153 US$/kg for the FPEF and 0.102 US$/kg for the NPEF. The production costs based exergy and exergoeconomic factor of the FPEF are found to be 0.153 US$/kg and 45%. Those of the NPEF are obtained to be 0.102 US$/kg and the 67%. A novel method is also proposed for calculating the exergy cost per unit of the fuel.
Keywords: Exergoeconomic; Furnace; Perlite (search for similar items in EconPapers)
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0360544214013735
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:80:y:2015:i:c:p:589-598
DOI: 10.1016/j.energy.2014.12.015
Access Statistics for this article
Energy is currently edited by Henrik Lund and Mark J. Kaiser
More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().