EconPapers    
Economics at your fingertips  
 

Comparison of exergoeconomic analysis of two different perlite expansion furnaces

Mert Gürtürk, Hakan F. Oztop and Arif Hepbasli

Energy, 2015, vol. 80, issue C, 589-598

Abstract: In this study, exergoeconomic analyses of two different perlite expansion furnaces are performed based on the actual operational data. The exergy cost and the cost per unit of exergy of the expanded perlite produced by the Former Perlite Expansion Furnace (FPEF) are determined to be 62.886 US$/h and 648.309 US$/GJ while those produced by the New Perlite Expansion Furnace (NPEF) are obtained to be 106.734 US$/h and 503.463 US$/GJ, respectively. Additionally, the production costs based on exergy are calculated to be 0.153 US$/kg for the FPEF and 0.102 US$/kg for the NPEF. The production costs based exergy and exergoeconomic factor of the FPEF are found to be 0.153 US$/kg and 45%. Those of the NPEF are obtained to be 0.102 US$/kg and the 67%. A novel method is also proposed for calculating the exergy cost per unit of the fuel.

Keywords: Exergoeconomic; Furnace; Perlite (search for similar items in EconPapers)
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0360544214013735
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:energy:v:80:y:2015:i:c:p:589-598

DOI: 10.1016/j.energy.2014.12.015

Access Statistics for this article

Energy is currently edited by Henrik Lund and Mark J. Kaiser

More articles in Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:energy:v:80:y:2015:i:c:p:589-598