EconPapers    
Economics at your fingertips  
 

A test-rework process yield performance model for estimation of printed wiring board assembly cost

Koki Shimohashi, Xiaoying Zhou and Julie M. Schoenung

International Journal of Production Economics, 2009, vol. 119, issue 1, 161-173

Abstract: This paper proposes a new test-rework process yield performance (TRePYP) model, combined with an assembly cost estimation algorithm, for an accurate representation of current practice in printed wiring board (PWB) assembly, especially in the design phase. The model captures the "dedicated" feature of PWB assembly activities and, instead of adopting lumped parameters, utilizes easy-to-measure process parameters so that both assembly performance and assembly cost can be evaluated. In the case study, changes in assembly cost due to lead-free conversion are estimated. Care is taken to ensure that the TRePYP method can account for both quality degradation issues and changes in the test-rework workload.

Keywords: Process; yield; Assembly; cost; Printed; wiring; boards; Lead-free (search for similar items in EconPapers)
Date: 2009
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925-5273(09)00043-7
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:119:y:2009:i:1:p:161-173

Access Statistics for this article

International Journal of Production Economics is currently edited by Stefan Minner

More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:proeco:v:119:y:2009:i:1:p:161-173