Dynamic lot sizing problem with continuous-time Markovian production cost
Amir Azaron,
Ou Tang and
Reza Tavakkoli-Moghaddam
International Journal of Production Economics, 2009, vol. 120, issue 2, 607-612
Abstract:
This paper develops a polynomial algorithm for obtaining dynamic economic lot sizes in a single product multiperiod production system with the objective of minimizing total production and inventory costs over T periods. It is assumed that production costs are linear, inventory costs are concave, setup costs are zero and backlogging is not permitted in all periods. Moreover, the unit production cost is a stochastic variable, which is evolved according to a continuous-time Markov process over the planning horizon. The model is formulated as a stochastic dynamic programming (DP) optimization with the state variable being unit production cost. Then, it is solved using the backward dynamic programming approach. To justify the application of the proposed model, two practical cases are presented.
Keywords: Dynamic; lot; sizing; Dynamic; programming; Stochastic; processes (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925-5273(09)00120-0
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:120:y:2009:i:2:p:607-612
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().