EconPapers    
Economics at your fingertips  
 

A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness

King-Wah Pang

International Journal of Production Economics, 2013, vol. 141, issue 1, 127-136

Abstract: Machine scheduling problem has been extensively studied by researchers for many decades in view of its numerous applications on solving practical problems. Due to the complexity of this class of scheduling problems, various approximation solution approaches have been presented in the literature. In this paper, we present a genetic algorithm (GA) based heuristic approach to solve the problem of two machine no-wait flowshop scheduling problems that the setup time on the machines is class dependent, and the objective is to minimize the maximum lateness of the jobs processed. This class of machine scheduling problems has many practical applications in manufacturing industry, such as metal refinery operations, food processing industry and chemical products production processes, in which no interruption between subsequent processes is allowed and the products can be grouped into families. Extensive computation experiments have been conducted to evaluate the effectiveness of the proposed algorithm. Results show the proposed methodology is suitable to be adopted for the development of an efficient scheduling plan for this class of problems in real life application.

Keywords: Genetic algorithm; No-wait flowshop; Class based setup time; Maximum lateness (search for similar items in EconPapers)
Date: 2013
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527312002629
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:141:y:2013:i:1:p:127-136

DOI: 10.1016/j.ijpe.2012.06.017

Access Statistics for this article

International Journal of Production Economics is currently edited by Stefan Minner

More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:proeco:v:141:y:2013:i:1:p:127-136