EconPapers    
Economics at your fingertips  
 

Some due date determination scheduling problems with two agents on a single machine

Du-Juan Wang, Yunqiang Yin, Jianyou Xu, Wen-Hsiang Wu, Shuenn-Ren Cheng and Chin-Chia Wu

International Journal of Production Economics, 2015, vol. 168, issue C, 81-90

Abstract: This paper addresses some scheduling problems with two competing agents, called agents A and B, respectively, each of which has a set of independent nonpreemptive jobs to be scheduled for processing on a common machine. The due dates of jobs in each job set are considered as given parameters and must be assigned to individual jobs. Each agent wants to minimize a certain objective function that depends on the completion times and due dates of its jobs only. The goal is to find a feasible schedule and determine the due dates for all jobs of the two agents that minimizes the objective of agent A while keeping the objective of agent B below or at a fixed level Q. We consider nine problems arising from different criteria combinations for the two agents, depending on the criterion of each agent including the maximum lateness, total (weighted) tardiness, (weighted) number of tardy jobs, and total weighted tardiness and earliness, and state the complexity results for most of problems under consideration.

Keywords: Due date determination; Two agents; Scheduling (search for similar items in EconPapers)
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527315002261
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:168:y:2015:i:c:p:81-90

DOI: 10.1016/j.ijpe.2015.06.018

Access Statistics for this article

International Journal of Production Economics is currently edited by Stefan Minner

More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:proeco:v:168:y:2015:i:c:p:81-90