Spatial planning and optimisation for virtual distribution of BioCNG derived from palm oil mill effluent to meet industrial energy demand
Ming Kwee Lee,
Haslenda Hashim,
Jeng Shiun Lim and
Mohd Rozainee Taib
Renewable Energy, 2019, vol. 141, issue C, 526-540
Abstract:
Rise in energy prices and energy security concerns have become more crucial for the industrial sector to opt for an alternative fuel. Biogas could be used as fuel for electricity generation, boilers or upgraded and compressed as bio compressed natural gas (BioCNG) that can be utilised in various applications, such as transportation, fuel for industry and injected into a gas grid (as biomethane). Biogas, produced by anaerobic digestion (AD) of palm oil mill effluent (POME) can be used as a fuel substitute for natural gas in industry while reducing CO2 emission. Virtual distribution of BioCNG, which is from remotely located natural gas pipeline, has become economically attractive to the industry. However, this concept poses some issues concerning logistic due to the scattered spatial distribution of palm oil mills which discharge large quantities of POME for biogas recovery. Addressing these aspect require an integrated spatial planning and optimisation to synthesise location and allocation network of BioCNG virtual transportation to the respective industry. This paper presents the development of integrated spatial planning and optimisation of BioCNG supply and distribution network through virtual pipelines to meet the on-site energy demand of specific industry, while minimising the total operational cost. The data from network analysis of ArcGIS will be coded into the Generalised Algebraic Modelling System (GAMS) model to generate a supply cost curve for multiple sources of energy carrier, i.e., LNG, NG through pipeline network, BioCNG through virtual pipelines with and without upgrading. Two case studies were evaluated to determine the optimal energy supply allocation for demand location. This model is beneficial for BioCNG network management while reducing carbon emissions. Results showed the optimised combination of energy supply to meet energy demand of selected industries, which was 198.9 MW of BioCNG production and 401.1 MW of LNG import. The percentage cost reduction of the optimised energy supply is 36.3%.
Keywords: BioCNG; POME; Spatial planning; LNG import; Natural gas grid (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0960148119304021
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:renene:v:141:y:2019:i:c:p:526-540
DOI: 10.1016/j.renene.2019.03.097
Access Statistics for this article
Renewable Energy is currently edited by Soteris A. Kalogirou and Paul Christodoulides
More articles in Renewable Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().