A new methodology for offshore wind speed assessment integrating Sentinel-1, ERA-Interim and in-situ measurement
M. Majidi Nezhad,
M. Neshat,
A. Heydari,
A. Razmjoo,
G. Piras and
D. Astiaso Garcia
Renewable Energy, 2021, vol. 172, issue C, 1301-1313
Abstract:
Offshore Wind (OW) speed assessment is a key aspect for the development of new wind farms at sea. Satellites can be used to globally obtain ocean and sea distribution, compensating limited in-situ measurements. In this study, a new methodology to estimate the wind’s speed potential is here proposed. Preliminary, Sentinel-1 (S-1) images have been analyzed by means of the Sentinel Application Platform (SNAP) software, extrapolating wind speed data for each cell pixel size of a testing area. Then GIS (Geographic Information System) software has been used to map wind data and find the best pixel location comparing these data with in-situ data. Furthermore, wind speed has been analyzed using the ERA-Interim reanalysis dataset for areas within 11 km and 40 km from the Lillgrund OW farm in the Baltic Sea to better understand wind regimes. Finally, wind speed parameters obtained by S-1 in Sea Surface Water (SSW) with the 10 m standard high have been compared with wind speed recorded by Supervisory Control and Data Acquisition (SCADA) systems of two turbine using wind profile formula. Obtained results show the comparison accuracy of wind speed assessment for each center of the pixels by S-1 satellite images and in-situ (SCADA) measurements. Data actually depends on the distance between the selected center pixel and the location of the turbines. The obtained wind speed differences (0.26 m/s - RMSE = 1.38 and 0.92 m/s - RMSE = 1.82) pinpointed the direct effect of the distance between the selected pixel center and the in-situ measurements location in the S-1 imagery for wind speed potential assessment. Obtained results proved an improvement of the OW assessment accuracy using multiple satellite observations, demonstrating that SAR wind maps can support OW speed sites assessment by introducing observations in different phases of an OW farm project.
Keywords: Wind speed assessment; Offshore wind speed; SCADA; Sentinel-1; ERA-Interim; Marine renewables (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0960148121003803
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:renene:v:172:y:2021:i:c:p:1301-1313
DOI: 10.1016/j.renene.2021.03.026
Access Statistics for this article
Renewable Energy is currently edited by Soteris A. Kalogirou and Paul Christodoulides
More articles in Renewable Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().