Design and cost-benefit analysis of a novel anaerobic industrial bioenergy plant in Pakistan
Rizwan Rasheed,
Naghman Khan,
Abdullah Yasar,
Yuehong Su and
Amtul Bari Tabinda
Renewable Energy, 2016, vol. 90, issue C, 242-247
Abstract:
The design and Cost-benefit analysis (CBA) of a novel anaerobic bioenergy plant is presented. This plant can digest various feed sources including animal-manure, vegetable-fruit wastes, poultry wastes, sugar molasses etc. The fixed dome multi-digestor system enables a continuous feed and flow mechanism. It is also equipped with a biogas purification, compression and storage system. This medium scale bioenergy plant is the first of its kind in Pakistan. It has a total installation cost of US$105,000 and annual operation and maintenance cost of US$23,400. The average energy production is 142,380 kWh per annum. With a current average energy cost of US$0.315 per kWh from all sources in Pakistan, the cost-benefit ratio is 1.2 at an internal rate of return (IRR) of 19.76%, and short payback period.
Keywords: Biogas; Bio-fuels; Bioenergy generation; Pakistan (search for similar items in EconPapers)
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (7)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0960148116300088
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:renene:v:90:y:2016:i:c:p:242-247
DOI: 10.1016/j.renene.2016.01.008
Access Statistics for this article
Renewable Energy is currently edited by Soteris A. Kalogirou and Paul Christodoulides
More articles in Renewable Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().