EconPapers    
Economics at your fingertips  
 

Avoiding the Main Risks in the Recovery Plans of Member States

Jorge Núñez Ferrer

CEPS Papers from Centre for European Policy Studies

Abstract: This is the first of a series of reports dedicated to the preparation and implementation of the Recovery and Resilience Facility of the EU. It sets out some of the main risks to the success of the recovery programmes, such as a lack of focus and mistargeting, maintaining unsustainable sectors, delays in implementation, and the lack of both a European dimension and the capacity to implement such a complex programme over and above the normal EU budget. These risks can be mitigated or avoided, however. The report also presents a number of solutions to ensure that aspects critical to the recovery programmes – and the key objective of longer-term resilience – are implemented. It highlights the necessity for serious structural reforms in member states, better management and control systems at EU level, well-designed active labour market policies, and a clear framework for public private partnerships to ensure that they are used more effectively.

Pages: 20 pages
Date: 2021-03
New Economics Papers: this item is included in nep-rmg
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
https://www.ceps.eu/wp-content/uploads/2021/03/Rec ... ection-Paper-No1.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eps:cepswp:32463

Access Statistics for this paper

More papers in CEPS Papers from Centre for European Policy Studies Contact information at EDIRC.
Bibliographic data for series maintained by Margarita Minkova ().

 
Page updated 2025-03-30
Handle: RePEc:eps:cepswp:32463