A Three-Part Electricity Price Mechanism for Photovoltaic-Battery Energy Storage Power Plants Considering the Power Quality and Ancillary Service
Yajing Gao,
Fushen Xue,
Wenhai Yang,
Yanping Sun,
Yongjian Sun,
Haifeng Liang and
Peng Li
Additional contact information
Yajing Gao: School of Electrical and Electronic Engineering, North China Electric Power University, Baoding 071003, China
Fushen Xue: School of Electrical and Electronic Engineering, North China Electric Power University, Baoding 071003, China
Wenhai Yang: School of Electrical and Electronic Engineering, North China Electric Power University, Baoding 071003, China
Yanping Sun: School of Electrical and Electronic Engineering, North China Electric Power University, Baoding 071003, China
Yongjian Sun: School of Electrical and Electronic Engineering, North China Electric Power University, Baoding 071003, China
Haifeng Liang: School of Electrical and Electronic Engineering, North China Electric Power University, Baoding 071003, China
Peng Li: School of Electrical and Electronic Engineering, North China Electric Power University, Baoding 071003, China
Energies, 2017, vol. 10, issue 9, 1-21
Abstract:
To solve the problem of solar abandoning, which is accompanied by the rapid development of photovoltaic (PV) power generation, a demonstration of a photovoltaic-battery energy storage system (PV-BESS) power plant has been constructed in Qinghai province in China. However, it is difficult for the PV-BESS power plant to survive and develop with the current electricity price mechanism and subsidy policy. In this paper, a three-part electricity price mechanism is proposed based on a deep analysis of the construction and operation costs and economic income. The on-grid electricity price is divided into three parts: the capacity price, graded electricity price, and ancillary service price. First, to ensure that the investment of the PV-BESS power plant would achieve the industry benchmark income, the capacity price and benchmark electricity price are calculated using the discounted cash flow method. Then, the graded electricity price is calculated according to the grade of the quality of grid-connected power. Finally, the ancillary service price is calculated based on the graded electricity price and ancillary service compensation. The case studies verify the validity of the three-part electricity price mechanism. The verification shows that the three-part electricity price mechanism can help PV-BESS power plants to obtain good economic returns, which can promote the development of PV-BESS power plants.
Keywords: PV-BESS power plants; three-part electricity price; capacity price; graded electricity price; ancillary service price (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://www.mdpi.com/1996-1073/10/9/1257/pdf (application/pdf)
https://www.mdpi.com/1996-1073/10/9/1257/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:10:y:2017:i:9:p:1257-:d:109599
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().