Development of Changeover Operating Method Based on Performance Prediction of Hybrid Geothermal Heat Pump Systems through Field Test and Numerical Analysis
Ji-Hyun Shin,
Yoon-Bok Seong,
Yong-In Kim and
Young-Hum Cho
Additional contact information
Ji-Hyun Shin: Department of Architectural Engineering, Graduate School of Yeungnam University, 280 Daehak-Ro, Gyeongsan, Gyeongbuk 38541, Korea
Yoon-Bok Seong: Korea Conformity Laboratories, Seoul 06711, Korea
Yong-In Kim: Now Consulting Engineers Co. LTD, Seoul 05073, Korea
Young-Hum Cho: School of Architecture, Yeungnam University, 280 Daehak-Ro, Gyeongsan, Gyeongbuk 38541, Korea
Energies, 2020, vol. 13, issue 20, 1-15
Abstract:
The installation and operation of geothermal systems increased due to the expectation of good cooling and heating performance due to stable heat source temperatures. In actual geothermal system operations, heat source temperature rises or falls due to an imbalance of heating and cooling energy usage. Problems of source side temperature result in reduced geothermal system performance. The purpose of this study is to develop hybrid geothermal system operation technology to stabilize temperature and improve system performance by utilizing auxiliary heat source system. The auxiliary heat source system is operated by comparing the performance when operating the geothermal heat pump system alone and the performance when operating the hybrid geothermal heat pump system. The performance of a hybrid geothermal system is determined by the circulating water temperature of the geothermal system and the circulating water temperature of the auxiliary heat source system. Hybrid geothermal heat pump system performance is predicted through numerical analysis and collection of hybrid geothermal system performance data at various temperature ranges through field test. An operating method was developed using the predicted performance as the changeover operating point of the hybrid geothermal heat pump system. When applying the development and operation technology, it handled about 11% more load than the existing geothermal system operation. The addition of an auxiliary heat source increases the initial investment cost compared to the existing geothermal system, but decreases energy consumption, confirming that the initial investment cost of 15.3 years is recovered.
Keywords: hybrid geothermal heat pump system; changeover operating method; performance prediction; field test (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/1996-1073/13/20/5333/pdf (application/pdf)
https://www.mdpi.com/1996-1073/13/20/5333/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:13:y:2020:i:20:p:5333-:d:427350
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().