Short-Term Forecasting of Photovoltaic Power Generation Based on Feature Selection and Bias Compensation–LSTM Network
Cai Tao,
Junjie Lu,
Jianxun Lang,
Xiaosheng Peng,
Kai Cheng and
Shanxu Duan
Additional contact information
Cai Tao: State Key Laboratory of Advanced Electromagnetic Engineering and Technology, School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
Junjie Lu: State Key Laboratory of Advanced Electromagnetic Engineering and Technology, School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
Jianxun Lang: State Key Laboratory of Advanced Electromagnetic Engineering and Technology, School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
Xiaosheng Peng: State Key Laboratory of Advanced Electromagnetic Engineering and Technology, School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
Kai Cheng: State Key Laboratory of Advanced Electromagnetic Engineering and Technology, School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
Shanxu Duan: State Key Laboratory of Advanced Electromagnetic Engineering and Technology, School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
Energies, 2021, vol. 14, issue 11, 1-16
Abstract:
In this paper, a hybrid model that considers both accuracy and efficiency is proposed to predict photovoltaic (PV) power generation. To achieve this, improved forward feature selection is applied to obtain the optimal feature set, which aims to remove redundant information and obtain related features, resulting in a significant improvement in forecasting accuracy and efficiency. The prediction error is irregularly distributed. Thus, a bias compensation–long short-term memory (BC–LSTM) network is proposed to minimize the prediction error. The experimental results show that the new feature selection method can improve the prediction accuracy by 0.6% and the calculation efficiency by 20% compared to using feature importance identification based on LightGBM. The BC–LSTM network can improve accuracy by 0.3% using about twice the time compared with the LSTM network, and the hybrid model can further improve prediction accuracy and efficiency based on the BC–LSTM network.
Keywords: photovoltaic power generation; feature selection; bias compensation–long short-term memory network; prediction accuracy; training time (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (8)
Downloads: (external link)
https://www.mdpi.com/1996-1073/14/11/3086/pdf (application/pdf)
https://www.mdpi.com/1996-1073/14/11/3086/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:14:y:2021:i:11:p:3086-:d:562424
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().