Combined Production and Conversion of Energy in an Urban Integrated System
Davide Borelli,
Francesco Devia,
Ermanno Lo Cascio,
Corrado Schenone and
Alessandro Spoladore
Additional contact information
Davide Borelli: DIME—Dipartimento di Ingegneria Meccanica, Energetica, Gestionale e dei Trasporti, Università degli Studi di Genova, Via All’Opera Pia 15/A, 16145 Genova, Italy
Francesco Devia: DIME—Dipartimento di Ingegneria Meccanica, Energetica, Gestionale e dei Trasporti, Università degli Studi di Genova, Via All’Opera Pia 15/A, 16145 Genova, Italy
Ermanno Lo Cascio: DIME—Dipartimento di Ingegneria Meccanica, Energetica, Gestionale e dei Trasporti, Università degli Studi di Genova, Via All’Opera Pia 15/A, 16145 Genova, Italy
Corrado Schenone: DIME—Dipartimento di Ingegneria Meccanica, Energetica, Gestionale e dei Trasporti, Università degli Studi di Genova, Via All’Opera Pia 15/A, 16145 Genova, Italy
Alessandro Spoladore: DIME—Dipartimento di Ingegneria Meccanica, Energetica, Gestionale e dei Trasporti, Università degli Studi di Genova, Via All’Opera Pia 15/A, 16145 Genova, Italy
Energies, 2016, vol. 9, issue 10, 1-17
Abstract:
Within the framework of the European Combined Efficient Large Scale Integrated Urban Systems (CELSIUS) project, the Genoa demonstrator involves the insertion of a turbo expander (TE) to substitute the standard throttling process in a natural gas expansion station. In this way, the currently wasted mechanical energy will be recovered, while an internal combustion combined heat and power (CHP) unit will be used to meet the heating requirements of the gas before the expansion and to serve a small district heating network (DHN). Both TE and CHP are capable of delivering electric power (EP) up to 1 MW. In order to match the EP production vs demand is highly desirable to use the EP extra capacity for local EP final users, such as a nearby public school and a gas refueling station (RS). For limiting the school’s consumption of fossil fuel, it is possible to use the EP surplus generated by the demonstrator to feed a heat pump in parallel to the heating conventional system. With regard to the RS, the compressors are currently driven by electric motors, with a high-energy consumption. The integrated system gives the possibility of exploiting the surplus of electricity production and of recovering heat, which would be otherwise wasted, from the intercooling of compressed gas, thus powering the DHN through a preheating system. The result expected from this strategy is a relevant energy and emissions saving due to an integrated use of the electricity generated by the Genoese demonstrator for feeding the nearby school and RS.
Keywords: integrated energy grids; waste energy recovery; district heating network (DHN); turbo expander (TE); natural gas; fueling station; public school; multigrids; combined heat and power (CHP) (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (13)
Downloads: (external link)
https://www.mdpi.com/1996-1073/9/10/817/pdf (application/pdf)
https://www.mdpi.com/1996-1073/9/10/817/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:9:y:2016:i:10:p:817-:d:80383
Access Statistics for this article
Energies is currently edited by Ms. Agatha Cao
More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().