EconPapers    
Economics at your fingertips  
 

On the Reliability of Optimization Results for Trigeneration Systems in Buildings, in the Presence of Price Uncertainties and Erroneous Load Estimation

Antonio Piacentino, Roberto Gallea, Pietro Catrini, Fabio Cardona and Domenico Panno
Additional contact information
Antonio Piacentino: Department of Energy, Information Engineering and Mathematical Models, University of Palermo, Viale delle Scienze, 90128 Palermo, Italy
Roberto Gallea: Sistema Informativo di Ateneo, University of Palermo, Viale delle Scienze, 90128 Palermo, Italy
Pietro Catrini: Department of Energy, Information Engineering and Mathematical Models, University of Palermo, Viale delle Scienze, 90128 Palermo, Italy
Fabio Cardona: Department of Energy, Information Engineering and Mathematical Models, University of Palermo, Viale delle Scienze, 90128 Palermo, Italy
Domenico Panno: Department of Energy, Information Engineering and Mathematical Models, University of Palermo, Viale delle Scienze, 90128 Palermo, Italy

Energies, 2016, vol. 9, issue 12, 1-31

Abstract: Cogeneration and trigeneration plants are widely recognized as promising technologies for increasing energy efficiency in buildings. However, their overall potential is scarcely exploited, due to the difficulties in achieving economic viability and the risk of investment related to uncertainties in future energy loads and prices. Several stochastic optimization models have been proposed in the literature to account for uncertainties, but these instruments share in a common reliance on user-defined probability functions for each stochastic parameter. Being such functions hard to predict, in this paper an analysis of the influence of erroneous estimation of the uncertain energy loads and prices on the optimal plant design and operation is proposed. With reference to a hotel building, a number of realistic scenarios is developed, exploring all the most frequent errors occurring in the estimation of energy loads and prices. Then, profit-oriented optimizations are performed for the examined scenarios, by means of a deterministic mixed integer linear programming algorithm. From a comparison between the achieved results, it emerges that: (i) the plant profitability is prevalently influenced by the average “spark-spread” (i.e., ratio between electricity and fuel price) and, secondarily, from the shape of the daily price profiles; (ii) the “optimal sizes” of the main components are scarcely influenced by the daily load profiles, while they are more strictly related with the average “power to heat” and “power to cooling” ratios of the building.

Keywords: cogeneration; trigeneration; buildings; optimization; linear programming; stochastic; uncertainty; sensitivity; energy loads; prices (search for similar items in EconPapers)
JEL-codes: Q Q0 Q4 Q40 Q41 Q42 Q43 Q47 Q48 Q49 (search for similar items in EconPapers)
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
https://www.mdpi.com/1996-1073/9/12/1049/pdf (application/pdf)
https://www.mdpi.com/1996-1073/9/12/1049/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jeners:v:9:y:2016:i:12:p:1049-:d:85085

Access Statistics for this article

Energies is currently edited by Ms. Agatha Cao

More articles in Energies from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-24
Handle: RePEc:gam:jeners:v:9:y:2016:i:12:p:1049-:d:85085