EconPapers    
Economics at your fingertips  
 

Mapping the Barriers of Utilizing Public Private Partnership into Brownfield Remediation Projects in the Public Land Ownership

Heng Zhang, Guiwen Liu, Qingye Han () and Gong Chen
Additional contact information
Heng Zhang: School of Management Science and Real Estate, Chongqing University, Chongqing 400044, China
Guiwen Liu: School of Management Science and Real Estate, Chongqing University, Chongqing 400044, China
Qingye Han: School of Management Science and Real Estate, Chongqing University, Chongqing 400044, China
Gong Chen: School of Management and Economics, The Chinses University of Hong Kong, Shenzhen 518172, China

Land, 2022, vol. 12, issue 1, 1-16

Abstract: The financing issue is increasingly becoming a key problem for brownfield remediation in public land ownership, and Public Private Partnership (PPP) mode is considered a potentially effective solution. However, some barriers impede the utilization of the PPP mode into brownfield remediation projects in the situation of public land ownership. By taking China as an example, the study investigates the barriers when the PPP mode is used in brownfield remediation projects to deal with financing dilemmas. Specifically, 39 original barriers are first obtained from existing related literature. Based on these original barriers, a semi-structured questionnaire is designed and used in a Delphi process to achieve 14 final barriers, which can reflect the particular situation in China. To identify the interrelationship among these barriers, Interpretative Structural Modeling (ISM) is used to map the hierarchical structure of the final barriers, and the Cross-Impact Matrix Multiplication Applied to Classification (MICMAC) analysis is applied to show the relationship strengths of barriers. According to the results of the ISM and MICMAC analyses, three key barriers are determined, and several corresponding recommendations are provided from the perspective of the public administration.

Keywords: brownfield; financing; public private partnership; barriers (search for similar items in EconPapers)
JEL-codes: Q15 Q2 Q24 Q28 Q5 R14 R52 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/2073-445X/12/1/73/pdf (application/pdf)
https://www.mdpi.com/2073-445X/12/1/73/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jlands:v:12:y:2022:i:1:p:73-:d:1015660

Access Statistics for this article

Land is currently edited by Ms. Carol Ma

More articles in Land from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jlands:v:12:y:2022:i:1:p:73-:d:1015660