Order Acceptance and Scheduling Problem with Carbon Emission Reduction and Electricity Tariffs on a Single Machine
Shih-Hsin Chen,
Yeong-Cheng Liou,
Yi-Hui Chen and
Kun-Ching Wang
Additional contact information
Shih-Hsin Chen: Department of Information Management, Cheng Shiu University, Kaohsiung 833, Taiwan
Yeong-Cheng Liou: Department of Healthcare Administration and Medical Informatics, Research Center of Nonlinear Analysis and Optimization, Kaohsiung Medical University, Kaohsiung 807, Taiwan
Yi-Hui Chen: Department of Information Management, Chang Gung University, Taoyuan City 333, Taiwan
Kun-Ching Wang: Department of Information Technology & Communication, Shih Chien University, Kaohsiung City 845, Taiwan
Sustainability, 2019, vol. 11, issue 19, 1-16
Abstract:
Order acceptance and scheduling (OAS) problems are realistic for enterprises. They have to select the appropriate orders according to their capacity limitations and profit consideration, and then complete these orders by their due dates or no later than their deadlines. OAS problems have attracted significant attention in supply chain management. However, there is an issue that has not been studied well. To our best knowledge, no prior research examines the carbon emission cost and the time-of-use electricity cost in the OAS problems. The carbon emission during the on-peak hours is lower than the one in mid-peak and off-peak hours. However, the electricity cost during the on-peak hours is higher than the one during mid-peak and off-peak hours when time-of-use electricity (TOU) tariff is used. There is a trade-off between sustainable scheduling and the electricity cost. To calculate the objective value, a carbon tax and carbon dioxide emission factor are included when we evaluate the carbon emission cost. The objective function is to maximize the total revenue of the accepted orders and then subtract the carbon emission cost and the electricity cost under different time intervals on a single machine with sequence-dependent setup times and release date. This research proposes a mixed-integer linear programming model (MILP) and a relaxation method of MILP model to solve this problem. It is of importance because the OAS problems are practical in industry. This paper could attract the attention of academic researchers as well as the practitioners.
Keywords: order acceptance scheduling problem; setup times; carbon emission; carbon tax; time-of-use cost; single machine scheduling (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
https://www.mdpi.com/2071-1050/11/19/5432/pdf (application/pdf)
https://www.mdpi.com/2071-1050/11/19/5432/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:11:y:2019:i:19:p:5432-:d:272423
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().