A Comprehensive Construction and Demolition Waste Management Model using PESTEL and 3R for Construction Companies Operating in Central Asia
Ali Turkyilmaz,
Mert Guney,
Ferhat Karaca,
Zhanar Bagdatkyzy,
Aiganym Sandybayeva and
Gulzat Sirenova
Additional contact information
Ali Turkyilmaz: Master of Engineering Management Program, School of Engineering, Nazarbayev University, 010000 Astana, Kazakhstan
Mert Guney: Department of Civil and Environmental Engineering, Nazarbayev University, 010000 Astana, Kazakhstan
Ferhat Karaca: Department of Civil and Environmental Engineering, Nazarbayev University, 010000 Astana, Kazakhstan
Zhanar Bagdatkyzy: Master of Engineering Management Program, School of Engineering, Nazarbayev University, 010000 Astana, Kazakhstan
Aiganym Sandybayeva: Master of Engineering Management Program, School of Engineering, Nazarbayev University, 010000 Astana, Kazakhstan
Gulzat Sirenova: Master of Engineering Management Program, School of Engineering, Nazarbayev University, 010000 Astana, Kazakhstan
Sustainability, 2019, vol. 11, issue 6, 1-16
Abstract:
The construction industry in Central Asia has shown rapid growth in the last decade due to an economic boom, leading to high construction & demolition waste (C&DW) generation accompanied by waste management operations falling behind worldwide best practices. The present study first employs a comprehensive environmental screening approach, PESTEL analysis, to identify and assess critical external and internal factors that can affect C&DW management in a leading Central Asian construction company (headquarters in Kazakhstan, the country with the largest economy in the region). Then, a case study is performed using 3R (reduce-reuse-recycle) principles and subjecting this company. Current international practices tailored to the given context are provided, existing company practices and applied improvements are discussed and prioritized improvements with implied sustainability benefits are proposed. The findings and recommendations are applicable especially to other construction companies operating in Central Asia that would ensure more sustainable C&DW management operations in the future.
Keywords: 3R strategy; C&DW; construction & demolition waste; solid waste management; waste management hierarchy; waste minimization (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (10)
Downloads: (external link)
https://www.mdpi.com/2071-1050/11/6/1593/pdf (application/pdf)
https://www.mdpi.com/2071-1050/11/6/1593/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:11:y:2019:i:6:p:1593-:d:214296
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().