Exploring the Risk Factors of Infrastructure PPP Projects for Sustainable Delivery: A Social Network Perspective
Yan Wang,
Yujie Wang,
Xiuyu Wu and
Jiwang Li
Additional contact information
Yan Wang: School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan 430070, China
Yujie Wang: School of Management Science and Engineering, Tianjin University of Finance and Economics, Tianjin 300222, China
Xiuyu Wu: School of Management Science and Engineering, Tianjin University of Finance and Economics, Tianjin 300222, China
Jiwang Li: School of Management Science and Engineering, Tianjin University of Finance and Economics, Tianjin 300222, China
Sustainability, 2020, vol. 12, issue 10, 1-26
Abstract:
Due to the relatively long period and large capital flow of public-private partnership (PPP) projects, PPP participants are faced with a complex risk situation impeding the sustainable project delivery. In recent years, risk management of PPP projects has received increasing attention. In this paper, twenty risk factors associated with infrastructure PPP projects were identified by literature review and in-depth case studies. Relationship data for these twenty typical risk factors were obtained through structured interviews. Based on the obtained data, the risk relationship network within infrastructure PPP projects was identified, and the network structure characteristics were analyzed, including individual node attributes and the influence and cohesion of subgroups. The results indicate that key risk factor nodes can form a reaction chain via bridge nodes that can trigger a risk domino effect within PPP projects. Specifically, the key risk factors of PPP projects are divided into two categories, the first of which include risk factors that have powerful and independent influence, such as delay in government approval, government credit, and imperfect legal and regulatory systems. The second category includes risk factors that are highly vulnerable and easily influenced, such as completion risks, insufficient revenue in the market, and fee change. A key risk factor reaction chain is one in which legal change leads to a decline in government credit rating, triggering a contract risk. Twelve bridge nodes were identified that play an important intermediary role in the network, e.g., legal change, public objection, and financing risk. This paper extends the application of social network analysis in PPP projects management research and identifies the key risk factors and crucial factors influencing chain reactions in PPP projects. The results provide a more in-depth understanding of sustainable PPP project management for government agencies and private enterprises.
Keywords: infrastructure PPP project; risk factors; relationship analysis; social network analysis; sustainable project delivery (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (12)
Downloads: (external link)
https://www.mdpi.com/2071-1050/12/10/4152/pdf (application/pdf)
https://www.mdpi.com/2071-1050/12/10/4152/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:12:y:2020:i:10:p:4152-:d:360126
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().