Adopting Agile Project Management Practices in Non-Software SMEs: A Case Study of a Slovenian Medium-Sized Manufacturing Company
Tena Žužek,
Žiga Gosar,
Janez Kušar and
Tomaž Berlec
Additional contact information
Tena Žužek: Faculty of Mechanical Engineering, University of Ljubljana, Aškerčeva cesta 6, 1000 Ljubljana, Slovenia
Žiga Gosar: Elvez d.o.o., Ulica Antona Tomšiča 35, 1294 Višnja Gora, Slovenia
Janez Kušar: Faculty of Mechanical Engineering, University of Ljubljana, Aškerčeva cesta 6, 1000 Ljubljana, Slovenia
Tomaž Berlec: Faculty of Mechanical Engineering, University of Ljubljana, Aškerčeva cesta 6, 1000 Ljubljana, Slovenia
Sustainability, 2020, vol. 12, issue 21, 1-17
Abstract:
In today’s highly dynamic and unpredictable project environment, companies need to be able to manage changes quickly and effectively, otherwise, the final product will not be current and will only go to waste. Traditional project management approaches that focus on planning are no longer efficient and companies are forced to adopt new ways of working. As a result, more flexible agile project management (APM) approaches have emerged over the last decades. Originally developed for the software industry, APM is now increasingly recognized and adopted also by other industry sectors. However, due to some discipline-specific differences, the adoption of APM by non-software companies is challenging and requires many adjustments and high financial input. While the larger organizations have sufficient resources to make such a transition, small and medium-sized enterprises (SMEs) generally cannot afford to do so, and therefore need alternative strategies to increase their agility and stay competitive on the global market. In this paper, we present a case study of a Slovenian medium-sized manufacturing company that implemented only certain APM practices separately and not as part of a structured APM methodology, and still managed to achieve significant benefits: improved communication, faster detection of discrepancies, more effective problem-solving and greater flexibility. The results also suggest that APM practices, even when implemented separately, positively impact project success in terms of both efficiency and stakeholder satisfaction, and can thus help in establishing an economically, socially, and environmentally more sustainable workplace.
Keywords: project management; agile; manufacturing; SMEs: project success (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (6)
Downloads: (external link)
https://www.mdpi.com/2071-1050/12/21/9245/pdf (application/pdf)
https://www.mdpi.com/2071-1050/12/21/9245/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:12:y:2020:i:21:p:9245-:d:441198
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().