EconPapers    
Economics at your fingertips  
 

The Evolutionary Game of Stakeholders’ Coordination Mechanism of New Energy Power Construction PPP Project: A China Case

Lei Gao and Zhen-Yu Zhao
Additional contact information
Lei Gao: School of Economics and Management, Beijing Key Laboratory of New Energy and Low-Carbon Development, North China Electric Power University, Changping, Beijing 102206, China
Zhen-Yu Zhao: School of Economics and Management, Beijing Key Laboratory of New Energy and Low-Carbon Development, North China Electric Power University, Changping, Beijing 102206, China

Sustainability, 2020, vol. 12, issue 3, 1-24

Abstract: The government, investors, and the public have formed a dynamic multi-game relationship on the Public-Private-Partnership (PPP) project, but few studies include them in a system to study their win–win solutions. Firstly, we constructed a tripartite game model of the government, investors, and the public based on evolutionary game theory. Secondly, the evolutionary process of tripartite strategy behaviors was studied with the system dynamics (SD) model. Finally, the impact of changes in key factors on behavior strategies was studied through sensitivity analysis. The results show the following: (1) In the outsourcing of new energy and power construction PPP projects, the three parties will eventually reach the equilibrium state of {government supervision, public participation, investors effort}, the three parties achieve a win–win situation and the project benefits are the highest at this time, and the public participation will play an important role in promoting the smooth outsourcing of PPP projects. (2) The strategic choices of the government, investors, and the public are sensitive to changes in the corresponding exogenous variables. (3) The security factor plays a crucial role in the choice of public strategy. The public’s choice is not only affected by its own income and cost, but also by the amount of compensation promised by the government and the estimated damage caused by the investor.

Keywords: new energy power; PPP; coordination mechanism; evolutionary game; system dynamics (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (8)

Downloads: (external link)
https://www.mdpi.com/2071-1050/12/3/1045/pdf (application/pdf)
https://www.mdpi.com/2071-1050/12/3/1045/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:12:y:2020:i:3:p:1045-:d:315403

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:12:y:2020:i:3:p:1045-:d:315403