Optimization of Green Building Design Processes: Case Studies within the European Union
Alessandro Orsi,
Ignacio Guillén-Guillamón and
Eugenio Pellicer
Additional contact information
Alessandro Orsi: School of Architecture, Universitat Politècnica de València, Camino de Vera s/n, 46022 Valencia, Spain
Ignacio Guillén-Guillamón: School of Architecture, Universitat Politècnica de València, Camino de Vera s/n, 46022 Valencia, Spain
Eugenio Pellicer: School of Civil Engineering, Universitat Politècnica de València, Camino de Vera s/n, 46022 Valencia, Spain
Sustainability, 2020, vol. 12, issue 6, 1-16
Abstract:
Green buildings have recently become a key aspect of the construction field and bring along a renovation of the whole industry chain. Such changes introduce new challenges for all subjects involved, and designers are also affected by such issues, especially for the development of projects based on international green building standards. Within this scope, project management plays a key role in the optimization of the design phase. This research analyzes the design process of international projects from the project management perspective through a multiple case study approach, considering the sustainability-related tasks that negatively affect the project design development under two types of contractual approaches: Design-Build and Design-Bid-Build. It aims to identify whether the Design-Build or Design-Bid-Build process is the best solution for developing green building projects. Two case studies in Italy and two case studies in Spain are analyzed, and the effects of the project management issues are evaluated under three different points of view: Time, cost, and level of sustainability of the building. A poorly planned process for the achievement of the various green building features of the project can impact the project schedule and the budget, whereas, a poorly managed project could also negatively impact its green building features. Finally, this research also highlights the positive relationship between process integration and green building design development.
Keywords: design-bid-build; design-build; green building; lean; optimization; project (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.mdpi.com/2071-1050/12/6/2276/pdf (application/pdf)
https://www.mdpi.com/2071-1050/12/6/2276/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:12:y:2020:i:6:p:2276-:d:332468
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().